Skip to Content

References /Photovoltaic systems /From 20 Kwp to 100 Kwp

P.G. system

Installation: Ground installation – business
Location: Castel Ritaldi (Pg)
Installed power: 99.60 Kwp
Expected annual production: 129,480 Kwh
Modules: Polycrystalline
Commissioning date: 21/03/2011
CO2 emissions avoided: 68,755 Kg/year

B.C. System

Installation: On agricultural outbuilding - Farm
Location: Castel Ritaldi (Pg)
Installed power: 41.595 Kwp
Expected annual production: 51,994 Kwh
Modules: Polycrystalline
Commissioning date: 31/08/2011
CO2 emissions avoided: 27,608.68 Kg/year