Skip to Content

References /Photovoltaic systems

System for car shed

Installation: Car shed / private residence
Location: Castel Ritaldi (Pg)
Installed power: 5.98 Kwp
Expected annual production: 7,475 kwh
Modules: Polycrystalline
Commissioning date: ???

Maggiori Informazioni »

N.A. system

Installation: Car shed - private residence
Location: Castel Ritaldi (Pg)
Installed power: 5.94 Kwp
Expected annual production: 7,425 kwh
Modules: Polycrystalline
Commissioning date: 18/08/2010
CO2 emissions avoided: 3,943 Kg/year

N.N. Srl system

Installation: ??????
Location: Castel Ritaldi (Pg)
Installed power: 6.00 Kwp
Expected annual production: 7,500 Kwh
Modules: Polycrystalline
Commissioning date: 22/12/2009
CO2 emissions avoided: 3,983 Kg/year

T.G.system

Installation: Integrated – private residence
Location: Spoleto (Pg)
Installed power: 5.98 Kwp
Expected annual production: 7,475 Kwh
Modules: Polycrystalline
Commissioning date: under construction
CO2 emissions avoided: 3,970 Kg/year

S.G. system

Installation: Integrated – private residence
Location: Spoleto (Pg)
Installed power: 5.98 Kwp
Expected annual production: 7,475 Kwh
Modules: Polycrystalline
Commissioning date:
CO2 emissions avoided: 3,970 Kg/year

 

M.E. system

Installation: Integrated – private residence
Location: Scheggino (Pg)
Installed power: 5.98 Kwp
Expected annual production: 7,475 Kwh
Modules: Polycrystalline
Commissioning date:
CO2 emissions avoided
: 3,970 Kg/year

D.F. system

Installation: Integrated – private residence
Location: Castel Ritaldi (Pg)
Installed power: 5.98 Kwp
Expected annual production: 7,475 Kwh
Modules: Polycrystalline
Commissioning date: 07/12/2010
CO2 emissions avoided: 3,970 Kg/year

S.P. system

Installation: Integrated – private residence
Location: Castel Ritaldi (Pg)
Installed power: 5.94 Kwp
Expected annual production: 7,425 kwh
Modules: Polycrystalline
Commissioning date: 24/05/2010
CO2 emissions avoided: 3,943 Kg/year

P.R. system

Installation: Integrated – private residence
Location: Castel Ritaldi (Pg)
Installed power: 5.94 Kwp
Expected annual production: 7,425 kwh
Modules: Polycrystalline
Commissioning date: 28/12/2009
CO2 emissions avoided: 3,943 Kg/year

F.M. system

Installation: Shelter
Location: Castel Ritaldi (Pg)
Installed power: 4.62 Kwp
Expected annual production: 5,775 kwh
Modules: Polycrystalline
Commissioning date: 06/04/2010
CO2 emissions avoided: 3,066 Kg/year